19-04 Plainview Avenue, Queens
Hospital · built 1982 · Block 15636, Lot 1.
Building permits
- Alteration, filed May 8, 2026, estimated cost $12K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 9, 2025, estimated cost $128K, described as “Repair of masonry facade where stepped cracks occur at each end of the parapet along the front elevation. Replace dislodged bricks on shelf angles with assoc. flashing weeps, lintel replacemnt and assoc. work. No change in occupancy, use…”
- Alteration, filed May 22, 2025, estimated cost $1.8M, described as “The existing cooling towers serving the chiller plant will be demolished and replaced with new "in-kind" cooling towers.”
- Alteration, filed Nov 4, 2024, estimated cost $1.6M, described as “Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.”
- Alteration, filed Aug 7, 2024, estimated cost $650K, described as “Modification of the existing plumbing system to remove, relocate, and install new plumbing fixtures as shown on the drawings herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 24, 2024, estimated cost $1.6M, described as “Modification of the existing mechanical system in relation to 9th floor renovations as shown on the drawings filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 20, 2024, described as “Suspended scaffoldoutrigger system andinspection for exteriorfacade restoration works and inspections”
- Alteration, filed Jun 10, 2024, estimated cost $250K, described as “Modification of the existing sprinkler system to remove and install new sprinkler heads as shown on the drawings filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 28, 2024, described as “Suspended scaffoldoutrigger system andinspection for exteriorfacade restoration work”
- Alteration, filed May 28, 2024, estimated cost $6.2M, described as “Renovation of the interior 9th floor including construction of drywall partitions and finishes upgrade as shown on the drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 6, 2024, estimated cost $550K, described as “Mechanical application filed for in-kind fan coil unit replacements..”
- Alteration, filed Apr 22, 2024, estimated cost $8K, described as “Accessory dunnage for mechanical equipment on the roof.”
- Alteration, filed Apr 18, 2024, estimated cost $400K, described as “Replacement of existing self-contained AC-1 & AC-3 systems with their respective dry-coolers serving the data center room.”
- Alteration, filed Apr 2, 2024, estimated cost $50K, described as “Dunnage, catwak and related work being erected above roof for support of new equipment”
- Alteration, filed Mar 21, 2024, estimated cost $25K, described as “Application filed for the removal of the existing steam boilers, pumps, piping, heat exchangers, and concrete slab related to the steam-to-hot water conversion. Replace concrete slabs with new housekeeping pads. Pl and mh work filed…”
- Alteration, filed Mar 11, 2024, estimated cost $250K, described as “Mechanical application filed for air handling unit replacements.”
- Alteration, filed Feb 20, 2024, estimated cost $25K, described as “Application filed for the removal of existing domestic water heaters, associated ducts and piping.”
- Alteration, filed Feb 16, 2024, estimated cost $100K, described as “Related Landscaping and earth work for Installation of telecomm conduit in relation to NB on adj property.”
- Alteration, filed Feb 9, 2024, estimated cost $125K, described as “Application filed for structural work associated with applications # Q00975247-I1, Q00976620-I1 & Q00976659-I1.”
- Alteration, filed Jan 29, 2024, estimated cost $25K, described as “Application filed for the removal of the existing steam absorption chillers and associated piping. Install new 6" concrete slab related. Pl and mh work filed separately.”
- Alteration, filed Jan 19, 2024, estimated cost $15K, described as “Temporary opening at the roof opening of the chiller plant. Temporary boiler room wall opening. No change of use, egress, or occupancy under this application”
- Alteration, filed Dec 13, 2023, estimated cost $15K, described as “Temporary opening at the roof opening of the chiller plant. Temporary boiler room wall opening. No change of use, egress, or occupancy under this application”
- Alteration, filed Oct 24, 2023, estimated cost $50K, described as “Steel tube posts installed above roof for equipment support as shown on submitted plans. No change in occupancy, use or egress.”
- Alteration, filed Oct 6, 2023, estimated cost $25K, described as “Application filed herewith to submit ecc compliance drawings for replacement of existing lighting fixtures with led and replacement of existing lighting controllers. Restore surfaces to original condition, including paint and patching to…”
- Alteration, filed Oct 6, 2023, estimated cost $90K, described as “Application filed herewith to replace in-kind plumbing fixtures using the existing roughing.”
16 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $17,535,150
- Market value (city estimate)
- $38,967,000
- Taxable value
- $0
- Assessed land
- $1,530,000
- Assessed improvements
- $16,005,150
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $1,902,213 a year below the full tax.
Zoning
R5: floor area ratio 0.70 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- ST JOHNS AMBULATORY CARE BLDG (City Planning P1992Q0135): Completed, decided Sep 15, 1992. SPEC PERMIT TO UTILIZE A FAR. OF 2.0 INSTEAD OF THE "USUAL"*1.27 IN AN R5 ZONE IN ORDER TO ADD APPROX 24,000SF IN A*1-STORY BLDG