# 3229 Far Rockaway Boulevard, Queens

Vacant land · Block 15950, Lot 29.

On Umarelli: https://umarelli.org/nyc/4159500029/3217-far-rockaway-boulevard

More construction in Far Rockaway: https://umarelli.org/nyc/queens/far-rockaway.md

## Building permits

- New Building — Large Residential, filed Oct 6, 2025, 99 units, 8 stories, described as “Proposed eight (8) story mixed use building.”
- New Building — Large Residential, filed Oct 6, 2025, 99 units, 8 stories, described as “Proposed eight (8) story mixed use building.”
- New Building — Large Residential, filed Aug 6, 2025, 88 units, 8 stories, described as “Proposed eight (8) story mixed use building.”
- Alteration, filed Oct 12, 2026, described as “Installation of suspended scaffold and material hoist for exterior facaderepairs.suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nycbuildingcode. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 6, 2026, described as “Installation of suspended scaffold and material hoist for exterior facaderepairs.suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nycbuildingcode. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 23, 2026, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 23, 2026, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 20, 2026, described as “Installation of temporary pipe & system scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 20, 2026, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2026, described as “Installation of temporary pipe & system scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2026, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 1, 2026, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 30, 2026, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 30, 2026, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 30, 2021, estimated cost $334K, described as “Installation of mechanical system”
- Alteration, filed Mar 30, 2021, estimated cost $212K, described as “Installation of plumbing fixtures for new building”
- Alteration, filed Mar 5, 2021, estimated cost $6K, described as “Filing for (1) curb cut”
- Alteration, filed Feb 19, 2021, estimated cost $486K, described as “Structural filing in conjunction with new building application”
- Alteration, filed Dec 4, 2020, estimated cost $3K, described as “Construction fence for a new church building.”

## Property taxes

- Assessment: $1,149,750
- 2026–27 tax: $124,725
- Market value (city estimate): $2,555,000
- Taxable value: $1,149,750
- Assessed land: $1,149,750

## Zoning

R6: floor area ratio 0.00 built, 2.43 allowed by base zoning.

## Recent sales

- Dec 17, 2025: $8,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
