# 2604 Richmond Terrace, Staten Island

Industrial · built 2020 · Block 1151, Lot 27.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/5011510027/2604-richmond-terrace

More construction in Mariner's Harbor: https://umarelli.org/nyc/staten-island/mariners-harbor.md

Every lot on block 1151: https://umarelli.org/nyc/staten-island/1151.md

## Building permits

- Alteration, filed Feb 28, 2023, estimated cost $38K, described as “Dish: Installation of antenna sectors, GPS antenna and equipment cabinet on the roof. Installation of conduits and service connection as per plans. All work is in compliance with TPPN 5/98. No change to occupancy, use or egress.”
- Alteration, filed Sep 7, 2021, estimated cost $12K, described as “Illuminated accessory business sign on the wall. "Life Storage"”
- Alteration, filed Sep 7, 2021, estimated cost $5K, described as “Illuminated accessory business sign on the wall. "Life Storage"”
- Alteration, filed Sep 7, 2021, estimated cost $12K, described as “Illuminated accessory business sign on wall. "life storage"”
- Alteration, filed Jul 14, 2021, estimated cost $10K, described as “Installation of a Gantry System (Material Hoist) in conjunction with NB #510113379 as per the plans filed herewith. No change to Use, Egress or Occupancy.”
- Alteration, filed Mar 1, 2021, estimated cost $500K, described as “Installation of a Sprinkler and Standpipe System in conjunction with the New Building #510113379 as per the plans filed herewith. No Change to use, egress or occupancy.”
- Alteration, filed Feb 24, 2021, estimated cost $5K, described as “Installation of a 15 ft curb cut on la salle street as per the plans filed herewith.”
- Alteration, filed Dec 21, 2020, estimated cost $5K, described as “Proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application”
- Alteration, filed Aug 10, 2020, estimated cost $10K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 7, 2019, estimated cost $1K, described as “Installation of a temporary construction fence as per the plans filed herewith.”
- Alteration, filed Aug 29, 2019, estimated cost $5K, described as “Installation of a 29 ft curb cut on richmond terrace as per the plans filed herewith.”
- Alteration, filed Jun 6, 2019, estimated cost $3K, described as “Install plywood construction fence at 2600 Richmond & 2604 Rear Richmond Terrace”

## Building history

- Demolition, filed May 30, 2019, signed off Oct 2, 2019, stories 1 to 0, described as “Full demolition of 1 story storage building”
- New Building — Non-residential, filed Mar 14, 2019, signed off Aug 5, 2022, 6 stories
- Demolition, filed Jan 16, 2019, signed off Oct 2, 2019, stories 1 to 0, described as “Full demolition of 1 story building”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $7,093,800
- 2026–27 Tax: $113,754
- Market value (city estimate): $15,764,000
- Taxable value: $4,881,103
- Assessed land: $432,450
- Assessed improvements: $6,661,350

## Tax breaks

- ICAP Abatement, through Jun 30, 2047, a $416,285 credit this tax year.

## Zoning

M3-1: floor area ratio 2.10 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Dec 19, 2018: $1,970,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
