345B Mersereau Avenue, Staten Island
Utility · Block 1248, Lot 1.
Building permits
- New Building, filed Mar 1, 2024, 1 story, described as “This is the application for the New Service Building at the Mersereau Avenue Pump Station.”
- New Building, filed Mar 1, 2024, 2 stories, described as “This is the application for the New Pump Building at the Mersereau Avenue Pump Station.”
- Alteration, filed Jun 11, 2026, estimated cost $1K, described as “Installation and use of temporary scaffold as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 14, 2024, estimated cost $1.3M, described as “Partial demolition of existing Mersereau Pump Building. The existing building will be altered to serve as a below grade tank for sewage, which will have no power requirement, nor heating or ventilation. There are no energy components…”
- Alteration, filed Oct 4, 2024, estimated cost $2.1M, described as “Remove asbestos from filing this is for new building”
- Alteration, filed Oct 4, 2024, estimated cost $9.9M, described as “Foundation and structural work for the new pump building at the Mersereau Avenue Pump Station, including new side wall.”
- Alteration, filed Oct 4, 2024, estimated cost $2.4M, described as “Foundation work pertaining to manhole and catch basin. Structural work to existing building being altered to serve as a below grade tank for sewage.”
- Alteration, filed Sep 17, 2024, estimated cost $740K, described as “Provide electric heaters for Electrical, ATS, and Generator Rooms; Heater and exhaust fan for Toilet Room; heater for RPZ Room; Exhaust/intake louvers for combustion air and heat dissipation in Generator Room.”
- Alteration, filed Sep 17, 2024, estimated cost $321K, described as “Provide sump pumps and associated discharge piping and valves. Provide water service backflow preventer, hose bibbs and wall hydrants for washdown, service sink, roof drains.”
- Alteration, filed Sep 17, 2024, estimated cost $151K, described as “Provide water service backflow preventer, hose bibbs and wall hydrants for washdown, water heater for potable water, toilet/lavatory fixtures, service sink, sanitary floor drains, building sewer, roof drains.”
- Alteration, filed Sep 17, 2024, estimated cost $1.5M, described as “Provide intermittent ventilation of Wet Well and Screen Room, Dry Well Pump Room, Valve Room and Access Room; Electric heaters for Dry Well Pump Room, Valve Room and Access Room. Provide supply and exhaust fans.”
Zoning
R3-2: floor area ratio 0.00 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.