546 Gulf Avenue, Staten Island
Industrial · built 2018 · Block 1760, Lot 35.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 6, 2026, estimated cost $250K, described as “PLUMBING FILING AS PER PLANS. Provide new condensate drains for new cooling evaporator coils.”
- Alteration, filed Oct 6, 2026, estimated cost $4.8M, described as “Mechanical modification as per plans. No change in use, egress or occupancy”
- Alteration, filed Mar 24, 2026, estimated cost $111K, described as “Filing st for installation of suspended isolation curtains around the perimeter of equipment platforms as indicated on drawings. No changes occupancy or egress.”
- Alteration, filed Mar 23, 2026, estimated cost $260K, described as “Filing ms for installation of suspended isolation curtains around the perimeter of equipment platforms as indicated on drawings. No changes occupancy or egress.”
- Alteration, filed Mar 20, 2026, estimated cost $1.4M, described as “Filing st for installation of suspended isolation curtains around the perimeter of equipment platforms as indicated on drawings. No changes occupancy or egress.”
- Alteration, filed Jan 8, 2026, estimated cost $80K, described as “Additional sprinkler coverage under new ductwork”
- Alteration, filed Apr 1, 2025, estimated cost $4K, described as “Installation of 7000 btu/hr condensing unit. No change to egress, use, or occupancy.”
- Alteration, filed Sep 5, 2024, estimated cost $10K, described as “HVAC associated duct work. No change to egress, use, or occupancy.”
- Alteration, filed Aug 8, 2023, estimated cost $728K, described as “General construction for new conveyor system installation & catwalk for amazon facility as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2023, estimated cost $285K, described as “Installation of (7) new arsaw conveyor machines. No change in egress, use or occupancy.”
- Alteration, filed Jan 18, 2023, estimated cost $5K, described as “Installation of a temporary system scaffold stair tower with plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 14, 2022, estimated cost $499K, described as “Filing herewith for Parking lot traffic calming.”
- Alteration, filed Nov 29, 2021, estimated cost $106K, described as “Dematic corp. will install (2) new chutes off existing sorter, No change to use, egress or occupancy.”
- Alteration, filed Nov 2, 2021, estimated cost $45K, described as “Plumbing modification as per plans. No change to use, egress and occupancy.”
- Alteration, filed Aug 9, 2021, estimated cost $490K, described as “Modification to existing conveyor system at an existing facility. No change to egress, occupancy, or use.”
- Alteration, filed Dec 23, 2020, described as “Filing a combination Standpipe/Sprinkler application for the purposes of getting a DOB inspection for 225 PSI pressure test. All work on drawings reflect the information filed on a separate application.”
- Alteration, filed Jan 28, 2020, estimated cost $1K, described as “Installation of stair tower scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Jan 28, 2020, described as “Installation of chain link fence as per plans.”
- Alteration, filed Dec 12, 2019, estimated cost $85K, described as “As built 37 sp head under platform as per plans”
- Alteration, filed Nov 13, 2019, estimated cost $44K, described as “Install conveyor platform and stair. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 24, 2019, estimated cost $30K, described as “Installation of water closets, lav, floor drains, Urinals and sanitary lines as per plans.”
- Alteration, filed Aug 27, 2019, estimated cost $50K, described as “Installation of sanitary ejector pump for drainage as per plans, no change to use, egress or occupancy.”
- Alteration, filed Apr 23, 2019, described as “Installation of (1) illuminated accessory wall sign in conjunction with NB# 520301968.”
- Alteration, filed Apr 18, 2019, described as “Installation of (1) illuminated accessory wall sign in conjunction with NB # 520301968”
- Alteration, filed Oct 12, 2018, estimated cost $3K, described as “Non illuminated non advertising accessory wall sign - inside property line - matrix grid sign - no change of use, egress or occupancy.”
Building history
- New Building, filed Aug 22, 2018, signed off Nov 13, 2019, 1 story, described as “Filing to erect a guardhouse accessory to the main warehouse building.”
- New Building — Non-residential, filed Sep 22, 2017, plan exam - disapproved, 5 stories, described as “Erecting open parking garage structure as per plans.”
- New Building — Non-residential, filed Sep 22, 2017, signed off Aug 19, 2019, 5 stories
- New Building — Non-residential, filed May 18, 2017, signed off Nov 3, 2021, 1 story, described as “Filing to erect a one story commercial storage building.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $59,565,150
- 2026–27 Tax
- $2,103,700
- Market value (city estimate)
- $132,367,000
- Taxable value
- $55,346,310
- Assessed land
- $16,718,400
- Assessed improvements
- $42,846,750
Tax breaks
- ICAP Abatement, through Jun 30, 2044, a $3,900,268 credit this tax year.
Zoning
M3-1: floor area ratio 0.43 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).
Recent sales
- Mar 10, 2017: $67,200,000
Open-market sales since 2016, from the Department of Finance’s sales files.