200 Gulf Avenue, Staten Island
Utility · Block 1855, Lot 78.
Building permits
- Alteration, filed Aug 13, 2026, estimated cost $3.1M, described as “Hereby filing installation of new vehicular parking area, storm water management, trench drain & pavement at existing loading dock. Approved determination # PDA00013785. Subsequent structural and foundation work to be filed separately.”
- Alteration, filed Sep 13, 2024, estimated cost $350K, described as “Application filed for structural modification/additional which includes trenching and installing footings and concrete pads for electrical charging stations at exterior parking lot as per plans filed herewith. No change in use, egress or…”
- Alteration, filed Jul 26, 2024, estimated cost $141K, described as “Herewith filing to replace existing unit on the roof with a new one as per the plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 9, 2023, estimated cost $130K, described as “Remove existing gas fired chiller and gas fired unit heaters. Replace existing 2 set boiler modules with new in the boiler room. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Nov 9, 2023, estimated cost $130K, described as “Design includes replace existing cooling tower and chiller set with air cooled chiller, replace existing gas fired outside air unit with new. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Nov 9, 2023, estimated cost $200K, described as “Design includes replacing existing 2 set boiler modules with new. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Jul 26, 2022, estimated cost $212K, described as “Herewith filing to remove the CNG fueling station structure and appurtenant components.No changes to use, egress or occupants.”
- Alteration, filed Jul 21, 2022, estimated cost $1K, described as “Filing herewith for use of mechanical means DS1 in conjunction with application #520376913. No change in use, egress, or occupancy.”
- Alteration, filed Jul 21, 2022, estimated cost $5K, described as “Herewith filing to erect a construction fence in conjunction with the cng fuel station demo.”
- Alteration, filed Mar 23, 2022, estimated cost $168K, described as “Interior bathroom renovation”
- Alteration, filed Mar 21, 2022, estimated cost $294K, described as “Interior bathroom renovations to include Installation of plumbing fixtures”
- Alteration, filed Mar 16, 2022, estimated cost $378K, described as “Interior alterations - restroom renovation”
- Alteration, filed Dec 8, 2017, estimated cost $25K, described as “Installation of new curb cut filing as per plans.”
Zoning
M2-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).