# 40 Greenfield Avenue, Staten Island

Industrial · built 1970 · Block 2841, Lot 50.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/5028410050/40-greenfield-avenue

More construction in Rosebank: https://umarelli.org/nyc/staten-island/rosebank.md

Every lot on block 2841: https://umarelli.org/nyc/staten-island/2841.md

## Building permits

- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404978. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404969. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404967. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404962. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404959. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404868. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404726. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01404658. This application is for otcr and tax abatement.”
- Alteration, filed Jun 16, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description on S01403566. This application is for otcr and tax abatement.”
- Alteration, filed Jun 15, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description. The energy storage system modules will be installed on concrete pads and protected by fire suppression system per nfpa 15. Filed in conjunction with alt eese job #…”
- Alteration, filed Jun 13, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description. The energy storage modules will be installed on concrete pads and protected by fire suppression systems per nfpa 15. Filed in conjunction with alt eese job number…”
- Alteration, filed Jun 13, 2026, estimated cost $700K, described as “Installation of energy storage system equipment, per the system description. The energy storage modules will be installed on concrete pads and protected by fire suppression systems per nfpa 15. Filed in conjunction with alt eese #…”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage system equipment, per the system description. The energy storage modules will be installed on concrete pads and protected by fire suppression systems per nfpa 15. Filed in conjunction with alt eese #…”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage system equipment, per the system description. The energy storage modules will be installed on concrete pads and protected by fire suppression systems per nfpa 15. Filed in conjunction with alt eese #S01411614.”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage system equipment, per the system description. The energy storage modules will be installed on concrete pads and protected by fire suppression systems per nfpa 15. Filed in conjunction with alt eese #S01411611.”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description. The energy storage modules will be installed on concrete pads with and fire suppression systems per nfpa 15. Filed in conjunction with alt eese #.”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description. The energy storage modules will be installed on concrete pads. The bess will be protected with fire suppression systems per nfpa 15. Filed in conjunction with alt eese #.”
- Alteration, filed Jun 5, 2026, estimated cost $700K, described as “Installation of energy storage equipment, per the system description. The energy storage modules will be installed on concrete pads with fire suppression per nfpa 15. Filed in conjunction with alt eese S01410970-I1.”

## Building history

- Demolition, filed Oct 9, 2014, signed off Jul 29, 2015, stories 1 to 0

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $198,900
- 2026–27 Tax: $20,944
- Market value (city estimate): $442,000
- Taxable value: $192,870
- Assessed land: $158,850
- Assessed improvements: $40,050

## Zoning

M3-1: floor area ratio 0.04 built, 2.00 allowed by base zoning.

## Recent sales

- Jul 23, 2026: $2,950,000, 2,000 sq ft ($1,475 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
