330 Tompkins Avenue, Staten Island
Industrial · built c. 1924 · Block 2873, Lot 34.
Building permits
- Alteration, filed Feb 13, 2026, estimated cost $108K, described as “Install new chimney as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 16, 2025, estimated cost $15K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 29, 2025, described as “Installation of outrigger for facade repair.”
- Alteration, filed Oct 18, 2025, described as “Installation of outrigger for facade repair.”
- Alteration, filed Oct 8, 2025, estimated cost $2K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 27, 2025, estimated cost $470K, described as “Exterior restoration as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 26, 2023, estimated cost $310K, described as “This alt co app is to refile alt i # 520111405 for minor interior renovations to an existing as of right self-storage facility. Existing elevators, egress stairs and fire sprinklers to remain. Change of use from factory to self storage use…”
- Alteration, filed Aug 14, 2023, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Mar 31, 2023, estimated cost $129K, described as “Modification of existing sprinkler system. No change in use, egress or occupacy.”
- Alteration, filed Dec 6, 2022, estimated cost $2.5M, described as “Exterior facade repairs and waterproofing, Stucco work, fence installation, painting. No change in use egress or occupancy”
- Alteration, filed Oct 7, 2022, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 11, 2021, estimated cost $30K, described as “Connect to existing gas piping for one (1) replacement boiler and one (1) gas burner. No change in use, egress or occupancy.”
- Alteration, filed May 11, 2021, estimated cost $140K, described as “Install one (1) replacement boiler and one (1) gas burner as per plans. Abandon three (3) existing boilers. No change in use, egress or occupancy.”
- Alteration, filed Sep 2, 2020, estimated cost $17K, described as “AT&T - Replacement of existing antennas with installation/replacement of RRH units on roof. Replacement of cabinet on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Feb 10, 2020, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 14, 2019, estimated cost $3K, described as “AT&T - Installation of additional telecommunication antenna with related echo repeaters on the roof. All work is in compliance with TPPN 5/98. No change in use, egress and occupancy.”
- Alteration, filed Oct 30, 2018, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 19, 2018, estimated cost $31K, described as “AT&T / Replacement of existing telecommunications antennas with replacement of RRH units on roof. Removal and installation of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to…”
Property taxes
- Assessment
- $16,668,450
- 2026–27 Tax
- $713,602
- Market value (city estimate)
- $37,041,000
- Taxable value
- $6,578,190
- Assessed land
- $1,414,350
- Assessed improvements
- $15,254,100
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2029, about $79,902 a year below the full tax.
Zoning
M3-1: floor area ratio 2.40 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 27, 2022: $57,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- POLICE DEPT RELOCATION OFFICE (City Planning P1992R0429): Completed, decided May 28, 1992. ACQUIRE 29,000SF OF SPCAE TO HOUSE THE RELOCATION OF 7 NYCPD*S.I. UNITS