2071 Clove Road, Staten Island
Commercial · built c. 1939 · Block 2921, Lot 6.
Building permits
- Alteration, filed Jul 1, 2025, estimated cost $6K, described as “Installation of temporary shoring as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 21, 2025, estimated cost $159K, described as “Install two new boilers and two new burners. No change in use, egress or occupancy.”
- Alteration, filed May 1, 2025, estimated cost $71K, described as “Modification to existing VERIZON site on the roof. Installation of (1) platform with related cabinets, replacement of (4) antennas and (4) RRH units and removal of (1) equipment cabinet.”
- Alteration, filed Mar 12, 2025, estimated cost $750K, described as “Int/ex alt to exist primary pres reg bldg including acm abatement via dep V5 variance for national grid. Per sect. 28-105-4.3 of NYC ac, public utility gas work shall be exempt from NYC bldg permit no change to use, egress or occupancy”
- Alteration, filed Mar 12, 2025, estimated cost $950K, described as “Int/ex alt to exist primary pres reg bldg (acm abatement completed) for national grid. Per sect. 28-105-4.3 of NYC ac, public utility gas work shall be exempt from NYC bldg permit no change to use, egress or occupancy”
- Alteration, filed Mar 10, 2025, estimated cost $25K, described as “Support of excavation filed in connection to public utility gas work performed by national grid per sect. 28-105-4.3 of NYC ac, public utility gas work shown in the drawing package shall be exempt from NYC building permit no change to use,…”
- Alteration, filed Mar 10, 2025, estimated cost $25K, described as “Instal of a temp. Construction fence to enclose soe filed in connection to public utility gas work performed by national grid per sect. 28-105-4.3 of NYC ac, public utility gas work shown in the drawing package shall be exempt from NYC…”
- Alteration, filed Mar 22, 2024, estimated cost $50K, described as “Filing for general construction work as per plans”
- Alteration, filed Sep 14, 2021, estimated cost $5K, described as “Relocating plumbing fixtures to create new accessible bathroom.”
- No Work, filed Mar 6, 2019
Building history
- Alteration, filed Oct 1, 2001, plan exam - disapproved, described as “ALT1 filing to legalize existing culture establishment_and obtain new filing at this time to faciliate with -- board of standards and appeals filing for a special permit allowing a physical culture establishment contrary to sec 73-36 of ZR.”
- Alteration, filed Jul 11, 2001, signed off Jul 22, 2011
- Alteration, filed Aug 12, 1997, plan exam - disapproved, described as “Change of use forportion of first floor from garages ans storages to offices.”
- Alteration, filed Jun 19, 1997, plan exam - disapproved, described as “Change of use of portions of 1ST_floor f rom garages and storage to health establishment as per plans and sc hedule a and schedule b herewith submitted.”
- Alteration, filed Jan 30, 1996, permit issued - entire job/work, described as “Change of use for portion of first floor from garages and storages”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $2,598,750
- 2026–27 Tax
- $268,074
- Market value (city estimate)
- $5,775,000
- Taxable value
- $2,471,180
- Assessed land
- $1,253,250
- Assessed improvements
- $1,345,500
Zoning
C8-1: floor area ratio 0.53 built, 1.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 213-10-BZ): Variance or Special Permit, Granted, filed Nov 9, 2010, decided Mar 8, 2011. Special Permit (§73-36) to legalize the operation of a Physical Culture Establishment (Dolphin Fitness Center). C8-1 zoning district.
- Variance or Special Permit (Board of Standards and Appeals 388-01-BZ): Variance or Special Permit, Granted, filed Dec 17, 2001, decided Dec 17, 2002. Special Permit (§73-36) to permit within a C8-1 zoning district the legalization of an existing physical culture establishment, located in portions of the first floor, and mezzanine level, in an existing 2-story, 30,000 square foot…