# 850 Hylan Boulevard, Staten Island

Parochial School · built c. 1925 · Block 3095, Lot 21.

On Umarelli: https://umarelli.org/nyc/5030950021/850-hylan-boulevard

More construction in Arrochar: https://umarelli.org/nyc/staten-island/arrochar.md

Every lot on block 3095: https://umarelli.org/nyc/staten-island/3095.md

## Building permits

- Alteration, filed Jun 12, 2026, estimated cost $12K, described as “Mechanical filing for elementary school building :installation of split system units at existing interior classrooms on 1ST, 2ND and 3RD floor. Condensing units at front roof of building.”
- Alteration, filed Jun 10, 2026, estimated cost $70K, described as “Direct replacement of (4) rooftop HVAC package units on existing roof curb”
- Alteration, filed Jun 10, 2026, estimated cost $58K, described as “Direct replacement of (5) rooftop HVAC package units on existing roof curb”
- Alteration, filed Oct 30, 2025, estimated cost $60K, described as “Boiler application filed in order to indicate replacement of boiler with (2) boilers at existing property, located in basement space. Connecting to ex gas line and ex. Water piping. New direct venting to exterior.”
- Alteration, filed Sep 26, 2025, estimated cost $45K, described as “Application filed herewith for direct replace of (3) HVAC units on existing dunnage at roof of existing building as per plans.”
- Alteration, filed Sep 22, 2025, estimated cost $34K, described as “Install new sprinkler system as per plans. Connect to existing standpipe system.”
- Alteration, filed Jan 17, 2024, estimated cost $600K, described as “Renovation and replacement of the existing athletic fields, installation of stack retaining walls and foundation for new fence”
- Alteration, filed Nov 2, 2023, estimated cost $26K, described as “Proposed installation of a 15' x 15' canopy on a steel frame and reinforced concrete footing located at building #5 - pre-k playground area”
- Alteration, filed Aug 9, 2023, estimated cost $12K, described as “Installation of 1 split system ac unit, at existing 2ND floor classroom rm. 221 and osp condensing. To obtain certificate of compliance (equipment use permit)no change in bulk, use, occupancy”
- Alteration, filed Jul 28, 2022, estimated cost $2K, described as “Installation of 1 split system ac unit, at existing 2ND floor classroom rm. 220 and osp condensing. To obtain certificate of compliance (equipment use permit)no change in bulk, use, occupancy”
- Alteration, filed Dec 3, 2021, estimated cost $8K, described as “Mechanical filing for elementary school building B3:installation of 1 split system ac units, at 4TH nurses office and roof.direct replacement of 2 HVAC split system units at 4TH floor classroom and osp.”
- Alteration, filed Nov 13, 2020, estimated cost $22K, described as “Installation of 1 split system HVAC units, at new dance studio (filed separately under application #540177510.)1 condensing HVAC units at exterior gradefiling to obtain certificate of compliance (equipment use permit)no change in bulk,…”
- Alteration, filed Jul 9, 2020, estimated cost $14K, described as “This DOB NOW BUILD application is filed for the plumbing work associated with the conversion of the locker room space to a dance studio in the basement level.”

## Property taxes

- Assessment: $20,085,300
- Market value (city estimate): $44,634,000
- Taxable value: $0
- Assessed land: $7,930,800
- Assessed improvements: $12,154,500

## Tax breaks

- Nonprofit exemption (religious school), with no end date, about $2,178,853 a year below the full tax.

## Zoning

R1-2: floor area ratio 0.20 built, 0.75 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
